AFTER STORAGE
When taking your motor out of storage, follow the procedure below to return it to operating condition:
Thoroughly clean the spark plugs. Replace them if necessary.
Check the gear-case oil level and if necessary, add gear oil according to the procedure outlined in the GEAR OIL section.
Lubricate all moving parts according to the LUBRICATION section.
Bleed air from the oil injection system according to the AIR BLEEDING section. Refill the oil tank with the specified engine
oil according to the ENGINE OIL section.
If air exists in the oil injection system, serious engine damage may result.
Clean-the motor and wax the painted surfaces.
To assist the oil injection system after an extended storage period (more than two months), use a 50 : 1 gasoline/oil mixture
in conjunction with the oil injection system, for the first hour (or 6 gallons of gasoline).If the motor is equipped with a battery, recharge the battery before installing‘ it.
SPECIFICATIONS
| Item | DT15MC/CE |
|---|---|
| Engine Type | Two Stroke |
| Number of Cylinders | 2 |
| Bore and Stroke | 59.0 x 52.0 mm (2.32 x 2.05 in.) |
| Maximum output kW (Horsepower) |
11.2 kW (15HP) |
| Full Throttle Operating Range | 4700-5700 min-1 (r/min.) |
| Ignition System | SUZUKI PEI |
| Engine Lubrication | Oil injection |
| Engine Oil Tank Capacity | 1.1 L (1.2/1.0 US/Imp.qt.) |
Power rated in accordance with NMMA procedure.
